Services included: temporary power for demolition, the relocation of existing power substation, new power systems, new 500 kW generator, fire alarm, interior and exterior lighting packages (and controls), exterior signage wiring, and security wiring
The scope of work also included the reconnection of power for central services and concessions prior to the 2020 MLB Season.
Client: Gilbane
Location: Lansdowne Street at Ipswich Street / Boston, MA