Electrical Construction Overview
For over 80 years, our Electrical Construction professionals provided expert electrical contracting services to the commercial, institutional, life sciences, hospitality, and retail markets in New England.
We collaborate with our clients and partners to deliver innovative solutions for complex projects. Our company leadership and skilled electricians build trust through best-in-class services, quality workmanship, safety practices, and reliability.
Best-In-Class Services
Gaston Electrical provides a full suite of best-in-class services to a diverse group of clients throughout the Greater Boston Region including:
- Preconstruction / Consulting
- Budgeting / Estimating
- Planning / Scheduling
- Design-Build
- Building Information Modeling
- Virtual Design & Construction
- Electrical Pre-fabrication
- Electrical Installation
- Fire Alarm
- 24-Hour Service
- Infrared Scanning
- Switchgear Testing & Maintenance
Key Contacts
James Reen
VP Construction Operations
Main / 781-255-8881
Direct / 781-688-8347
jreen@gastonelectrical.com
Recent Electrical Construction Projects
CRICO
1325 Boylston St. / Boston, MA
Gaston completed a high-end office fit-up that included all electrical and T/D work required for this second-floor project inside the new VanNess Building.
Avison Young / Boston Office
200 State St. / Boston, MA
Gaston completed a high-end office fit-up for the Boston Headquarters of this leading Commercial Real Estate Services Firm – including all electrical and T/D work across two floors.
AMGEN
One Kendall Square / Cambridge, MA
Gaston is providing design assist, pre-construction, estimating, coordination, and installation of all electrical, low-voltage, and security systems in a comprehensive, phased renovation including office, laboratory, and lobby spaces.
WeWork / Back Bay
31 St. James St. / Boston, MA
Gaston completed a 130,000 SF, multi-floor fit-up in and accelerated 3.5 month period.
United Health Group / Optum
1325 Boylston St. / Boston, MA
Gaston completed a high-end tenant fit-up for UHG Optum within the new Van Ness Building including office spaces on the 4th, 6th, 8th, 10th and 11th floors.
Harvard University / Standish Hall
1201 Mass. Ave. / Cambridge, MA
Gaston is providing full electrical services upgrades for the building systems, common areas, and student units on this phased, 12-month project.
Boston University / Myles Standish Hall
632 Beacon St. / Boston, MA
Gaston is providing full electrical services upgrades for the building systems, common areas, and student units on this phased 14-month project including a new electrical service, all new lighting, fire alarm, and power throughout.
AFFOA
12 Emily St. / Cambridge, MA
Gaston is completing a 15,000 SF fit-up for this MIT-affiliated group producing highly-sophisticated fabrics. Services include all fire alarm, lighting, power, and technology infrastructure systems.
Wayfair
4 Copley Place / Boston, MA
Gaston completed multiple phases of work over a 4-year period totaling approximately 500,000 SF of high-end office space.
Surface Oncology
50 Hampshire St. / Cambridge, MA
Gaston completed a high-end, 24,000 SF fit-up for new office and laboratory space including multiple freezer farms, tissue culture rooms, and large laboratory space fitted with overhead ceiling panel and wiremold.
Innovation & Design Building
21 Drydock Ave. / Boston, MA
Gaston completed extensive exterior promenade lighting and common area/lobby renovations including upgrades in lobbies, loading docks, front parking lots, entrance ways.
bluebird bio, Inc.
60 Binney St. / Cambridge, MA
Gaston is completing a high-end tenant fit-up across six floors totaling 160,000 SF along with security wiring for the entire 10-story building.
Flour Bakery + Cafe
40 Erie St. / Cambridge, MA
Gaston completed full electrical construction and fit-up of this bakery and cafe-themed restaurant within the Sidney Research Campus.
Harvard University / Bright-Landry Hockey Center
65 N. Harvard St. / Boston, MA
Gaston completed a comprehensive expansion and upgrade program for Harvard University within the existing Hockey Arena.
Wentworth Institute of Technology / Apartments @ 525
525 Huntington Ave. / Boston, MA
Completed this brand new residence hall on a tight urban footprint, within an aggressive 13-month schedule, including all electrical systems.
Voyager Therapeutics
64 Sidney St. / Cambridge, MA
Gaston completed the installation of electrical systems for 30,000 SF of lab and high-end office space including a vivarium and two large research laboratories.